Shop Drawings Up to Top Roof Rebar detailing

Columns and Wall up to Basement 01 completed. From Next Floor need to Start and complete verticals up to Top Roof. Total 13 Floors, some are typical, Drawing and BBS to do. Each Floor need separate submitted… (Budget: ₹600 – ₹2500 INR, Jobs: AutoCAD, Civil Engineering, Infrastructure Architecture, Structural Engineering, Tekla Structures)
Read More
Freelancer – New Projects
AutoCAD, Civil Engineering, Infrastructure Architecture, Structural Engineering, Tekla Structures

Scroll to Top